13.01.2015 Views

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

OAJ “O’ZLITINEFTGAZ”<br />

ПТЭО «Комплексное обустройство<br />

месторождения Сургиль с извлечением ценных<br />

компонентов»<br />

- Stopping vehicles to repair any excess fluid merge into the drainage tank, and gases<br />

are removed at the torch.<br />

Anti-seismic events<br />

All buildings and structures were designed taking into account the seismic data: the<br />

selection of precast concrete and steel framing members made of types of materials<br />

designed to accommodate seismic and foundations of buildings were designed for the<br />

special combination of loads, ie under the action of seismic force. .<br />

Thus, under anti-seismic measures are aimed at ensuring reliable and safe use of<br />

buildings, structures, and therefore the process equipment.<br />

Service personnel<br />

By staff permitted to perform work must meet the requirements in accordance with<br />

industry standards.<br />

Given these requirements, the workers allowed to work only after a special briefing<br />

as an introduction, and in the workplace.<br />

Thus, organizational, technical failures in plant operation is minimized.<br />

In general, processing equipment, adopted in the project, meets all modern<br />

requirements for the facilities of production, processing and transportation of gas.<br />

Thus, the proposed project activities and technical and environmental nature will<br />

allow the company to operate in safe mode.<br />

Книга 2. Часть 2. Проект ЗВОС по строительству ГХК<br />

81

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!