“O’ZLITINEFTGAZ” PC<br />

PFS “<strong>Surgil</strong> field complex costruction with valuable<br />

components retrieval”<br />

There are passes 7 loops to the incoming-line unit of <strong>Surgil</strong> CGTU from wells and<br />

three collectors from gas gathering stations. There is provided protection of loops from<br />

pressure excess (Drain Safety Spring Valve plant) and purging of loops and collectors on a<br />

torch.<br />

Humid natural gas from GS is distributed through technological lines of LTS plant<br />

and come into separator of first step S-101 where at the expense of centrifugal forces the<br />

great bulk of liquid and mechanical impurities are separated from gas (figure 6).<br />

After separator S-101 unstripped gas turned to tube space of recuperative heat<br />

exchanger T-101 where it is cooled by upstream of the treated gas.<br />

From heat exchanger T-101 unstripped gas come into separator of second step S-102<br />

for separation of the liquid phase allocated during gas cooling in heat exchanger T-101/1. 2.<br />

After separator S-102 unstripped gas turned to tube space of the second recuperative<br />

heat exchanger T-102 where it is cooled by cold upstream of the treated gas.<br />

There feeding RDEG by 80% of mass concentration in each section of heat<br />

exchanger T-102 for prevention of hydrate formation in humid natural gas stream.<br />

From heat exchanger T-102 gas come into separator S-0 for separation of the liquid<br />

phase allocated during gas cooling in heat exchanger T-102. and prevention of dropping<br />

liquid ingress in turbo-expander.<br />

After separator S-0 unstripped gas turned to turbo-expander where gas is expand up<br />

to pressure 5.0MPa. Thus, the temperature of treated gas drops to minus 10 0 С.<br />

There feeding RDEG by 80% of mass concentration on input of turbo-expander for<br />

prevention of hydrate formation in humid natural gas stream.<br />

Cooled gas-liquid stream come into low-temperature separator of third step S-103<br />

where gas is separated from waterlogged DEG and from hydrocarbonic condensate.<br />

Stripped and dry gas from separator С-103 consistently passes hole annulus of<br />

recuperative heat exchangers T-102 and Т-101. heats up in them by direct gas stream. Then,<br />

gas come into turbo compressor, located on one shaft with turbo-expander where<br />

compressed up to pressure 5.5MPa and through measuring assemble is transported to gas<br />

pipeline.<br />

The assembly of self-supporting gas measuring is intended for the commercial<br />

account of the dry gas supplied to the main gas pipeline. There is also provided gas fuel<br />

reduction in the given area for maintenance of the fire regenerator, torch, boiler house<br />

(auxiliary).<br />

<strong>Volume</strong> 2. Part 1. EIS Project for <strong>Surgil</strong> field construction<br />

48