13.01.2015 Views

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

“O’ZLITINEFTGAZ” PC<br />

PFS “<strong>Surgil</strong> field complex costruction with valuable<br />

components retrieval”<br />

Lighting of camp territory to execute by the lamps of RKU-01-250 type, installed on<br />

f/c supports of exterior lighting.<br />

Installed, design capacities and annual electric power consumption of the EСCP<br />

means are listed in the table 11:<br />

Table 11 - Annual electric power consumption of the EСCP means<br />

Name<br />

Installed capacity,<br />

kV<br />

Design capacity,<br />

kV<br />

Annual electric<br />

power<br />

consumption<br />

thous.kV.h.<br />

EСCP GGS -1. 2. 3 45 45 394.2<br />

EСCP of wells loops 144 144 1261.44<br />

EСCP of <strong>Surgil</strong> CGTU–<br />

Akchalak GCC gas pipeline<br />

and condensate line<br />

80 80 700.80<br />

Total length of TL 10kV makes:<br />

- for power supply of EСCP means, loops of wells, GGS -1. 2. 3 – 108km;<br />

- for power supply of EСCP means of <strong>Surgil</strong> CGTU– Akchalak GCC gas<br />

pipeline, condensate line – 115km;<br />

It is necessary to note, that device of electrochemical protection from gas pipeline<br />

corrosion is one of effective nature-conservative measures at minimum impact on soils and<br />

grounds.<br />

EСCP allows to considerably reducing the danger of corrosion destruction of gas<br />

pipelines and, therefore, emissions of hydrocarbons in atmospheric air.<br />

Water supply and sewerage, firefighting<br />

Water supply and sewerage technical decisions are directed to providing of<br />

projectable manufacture with water taking into account its specificity.<br />

Area water supply for industrial and fire-prevention needs is carried out by pump<br />

stations with pumps ESV 8-40-90М, installed over artesian wells of process water - 2pcs. (1<br />

development and 1 reserved) through water conduit L = km (2 lines).<br />

External firefighting is carried out from fire hydrants and wedge tubes with<br />

protective screen, installed on the loop network of fireproof water-supply line. Special<br />

requirements to water quality for firefighting are not demand.<br />

For clearing and disinfecting of incoming water from wells, for needs of household<br />

water supply it is provided water treatment installation EDU-2.5 TR-001-53805413-08 –<br />

factory-made packaged installation. Water treatment is carried out to quality – potable water<br />

O’zDSt 950:2000.<br />

<strong>Volume</strong> 2. Part 1. EIS Project for <strong>Surgil</strong> field construction<br />

58

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!