“Management of Ustyurt GCC infrastructure objects<br />

and <strong>Surgil</strong> GCF construction” UE »<br />

ening/neutralization by their mechanical mixing in open tank is 32% addition of Portland<br />

cement or 9 % addition of hardener ECO-2.<br />

8.6.5. Reagent choice (Portland cement or hardener ECO-2) as drilling cuttings hardener for each<br />

concrete case remains a prerogative of the customer – “Ustyurtgaz” USE, and will start from<br />

economic reasonability as, in spite of exceeding efficiency of ECO-2 hardener effect over<br />

Portland cement, its cost also exceeds cement cost.<br />

8.6.6. As practice shows, after well drilling works termination there is remain fixed part of thickened<br />

leaving at the bottom of cuttings storage barn (25-30%), over (45-50%) – moving part<br />

of thickened leaving, and more over fluid semi-fluid and liquid phase. It is also possible the<br />

lenses presence in moving part of thickened leaving consisting of fluid semi-fluid and liquid<br />

phases. Layout view of drilling cuttings content (waste drilling mud + drilling rock + drilling<br />

sewage waters) in cuttings storage barn after drilling works termination is resulted in the<br />

figure 8.1.<br />

8.6.7. Considering climatic conditions of drilling area, execution of work on drilling cuttings hardening<br />

and disposal in cuttings barn, with a glance of allowed period of drilling wastes temporary<br />

placement in cuttings barns, is recommended to begin in May. It is caused by the following factors;<br />

According to Decision of Cabinet of Ministers № 199 from May, 1, 2003 “On improvement<br />

of payments system for environmental pollution and drilling wastes placement in the Republic<br />

of Uzbekistan territory” it is allowed, in certain conditions, temporary storage of production<br />

wastes (up to six months) without compensatory payments.<br />

According to long-term meteorological observations, the days with minus temperature in this<br />

region exceeds 100, i.e. December, January, February and the beginning of March, and average<br />

depth of seasonal frost penetration in the region reaches 0.7m (peak - 115sm), that<br />

does not possible drilling cutting mixing process with binding substances in the open area.<br />

Practice shows, that after drilling works termination, there is collects in cuttings storage barn<br />

liquid phase layer above drilling cuttings (formation, drilling and storm sewage waters) by<br />

thickness to 35-40sm and execution of drilling cuttings hardening in the open area in time<br />

when the peak annual amount of precipitations is in the April, can lead to considerable exbarn<br />

walls<br />

insulating layer<br />

semi-liquid phase of drilling cuttings and DSW<br />

lens from semi-liquid<br />

and liquid phases<br />

drilling cuttings non-fluid,<br />

semi-solid layer<br />

drilling rock hard phase<br />

Figure 8.1 – Drilling cuttings layer-by-layer incision in cuttings storage barn after drilling<br />

works termination<br />