“O’ZLITINEFTGAZ” PC<br />

PFS “<strong>Surgil</strong> field complex costruction with valuable<br />

components retrieval”<br />

Area of CGTU of <strong>Surgil</strong> field is the beginning of gas pipeline and condensate line<br />

route with the route general direction to the southwest. Gas and chemical complex (GCC) is<br />

the pipeline route end.<br />

The pipeline route goes from CGTU area to 21km in southern direction to existing<br />

gas pipeline East Berdakh-Bukhara-Ural (26km) and then goes across at the distance not<br />

less than 23m, then on 58km crosses one line of Bukhara-Ural gas pipeline, turns to the<br />

south and then goes across to the existing Bukhara-Ural gas pipeline by diameter 1020 at<br />

the distance not less than 28m. On 86km the pipeline route crosses Bukhara-Ural gas<br />

pipeline by diameter 1020. on 98km crosspiece by diameter 1020 between Bukhara-Ural<br />

gas pipeline and CAC and goes to GCC to Akchalak region.<br />

Pipeline routes cross dirt roads only. The barchan, eolian sands take part in the<br />

lithologically structure of the pipeline routes.<br />

The project provides subsurface pipelining, whenever possible across to the lay of<br />

land. Minimum depth of pipelines is 1.0m.<br />

Turns of pipelines in horizontal and vertical plane are carried out by radius of free<br />

bending (ρ - according to diameters), branch pipes of cold flexure R-15-35m in accordance<br />

with GOST 24950-81.<br />

There are recommended pipes for construction of pipelines:<br />

- diameter 820. 720 TR 14-3-1573-99 Art. 17G1S-U - longitudinal pipes,<br />

produced by “Vyksun metallurgical works”;<br />

- pipes should be delivered with factory isolation of the strengthened type<br />

except for pipes of connection of tap valve assembly and for making of<br />

bent branch;<br />

- diameter 108. 273 TR 14-3-1128-2000 Art. 20 – steel pipes, seamless from<br />

rolled and forged blank;<br />

- diameter 168. 219 for condensate line in accordance with GOST 8732-78<br />

with hydro-test B 20 GOST 8731-74. Thickness of pipes wall is listed in<br />

table 1 by diameter<br />

There is provided installation of following mounting assembly in the project:<br />

On the gas pipeline:<br />

- guard tap valve of CGTU and GCC with two-way purging at the distance of<br />

500m from areas;<br />

- linear tap valves installed after 25-30km;<br />

- treatment piston launching assembly in the pipeline route beginning;<br />

- treatment piston receiver assembly in the pipeline route end.<br />

On the condensate line:<br />

- guard gate valves of CGTU and CGG at the distance of 100-300m from<br />

areas;<br />

<strong>Volume</strong> 2. Part 1. EIS Project for <strong>Surgil</strong> field construction<br />