13.01.2015 Views

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OAJ “O’ZLITINEFTGAZ”<br />

ПТЭО «Комплексное обустройство<br />

месторождения Сургиль с извлечением ценных<br />

компонентов»<br />

4 A N A L Y S I S O F E N V I R O N M E N T A L I M P A C T<br />

D E S I G N E D O B J E C T S<br />

This chapter includes the characteristics of the sources of environmental impact from the<br />

analysis of possible technological and engineering solutions for design of MCC<br />

Akchalak, transport gas to the COP Akchalak MG Hiva Beyneu, stable condensate -<br />

NOE Kyrkkiz, a residential village for staff, as well as characterization of the<br />

impacts, associated with the additional supply of pollutants in the environment and<br />

the extraction of natural resources, technological options and the impact of the main<br />

objects of the impact during construction and operation of the designed objects. The<br />

project implementation will be affected by the following environmental components:<br />

- Ambient air.<br />

Soil and vegetation.<br />

- Groundwater.<br />

Of the total project, you can select sources of pollution for the following processing chain:<br />

- Construction and operation of MCC Akchalak;<br />

- Construction and operation of external communication (pipelines, road, railway, etc.;<br />

- Construction and operation of a residential village for 1,645 people.<br />

On the basis of design decisions analyzed the impact of emissions, discharges, waste,<br />

removal of land for the construction and operation<br />

4.1 Impacts on the air, water, LAND AND VEGETATION DURING<br />

CONSTRUCTION<br />

During construction, designed buildings, structures and piping the air will be affected<br />

by emissions from internal combustion engines (ICE), road construction equipment and<br />

vehicles, as well as welding equipment and painting equipment.<br />

Книга 2. Часть 2. Проект ЗВОС по строительству ГХК<br />

56

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!