OAJ “O’ZLITINEFTGAZ”<br />

ПТЭО «Комплексное обустройство<br />

месторождения Сургиль с извлечением ценных<br />

компонентов»<br />

Impact on surface water is indirect and is related to the withdrawal of water for<br />

industrial and drinking purposes. Duration of exposure - the period of operation of the<br />

Project facilities. Temporal dynamics of water removal to be permanent fresh water.<br />

The area of distribution in the case of sewage on the evaporation ponds are<br />

limited to an area of evaporation ponds.<br />

Soils study region are major targets of exposure. At the same time the intensity<br />

of the impact is negligible, is periodic, increasing by accidental releases.<br />

Duration of exposure will not change because This value depends on the time of<br />

operation facilities. The impact will be continuous. Distribution area will not increase.<br />

Nature of the impact will remain as before, right.<br />

According to the calculations of atmospheric pollution and the experience of<br />

similar productions, it can be stated that the staff of the enterprise will breathe the air<br />

quality that meets sanitary standards at work sites, approved by the Ministry of<br />

Health of Uzbekistan.<br />

Soils, site investigation works and the surrounding area is an area of natural<br />

fertility is not high (it is necessary irrigation). Slight humus content is not allow to<br />

develop higher forms of vegetation. Wind erosion and the total number of dusty<br />

particles is one of the reasons for soil degradation. Based on the analysis of the soil in<br />

the impact zone of the object, we can conclude:<br />

- Construction of the facility is on land not suitable for planting crops.<br />

- The main impact of an object due to additional soil disturbance along the<br />

pipeline route.<br />

Due to the remoteness, surface waters are not objects of impact (only for the<br />

removal of water).<br />

At the other components of the environment (water, flora, fauna) under the<br />

proposed project interventions to prevent or mitigate the identified potential adverse<br />

impacts, a significant influence in the operation of the object is not assumed.<br />

The process of construction and operation of the planned facility may also have<br />

an impact on changes in socio-economic living conditions of the population of nearby<br />

settlements.<br />

The proposed design solutions are the proof of environmental performance of<br />

the project related to improving the environment or its individual components, as well<br />

as focus on prevention of environmental risks.<br />

Population living at a distance from the production facilities will not feel much<br />

change due to local nature of this project.<br />

Direct impact on water bodies do not have waste water. Possible contamination<br />

of groundwater by filtering water evaporation ponds, but the long-term operation of<br />

the bottom of the ponds covered with a layer of sediment, which prevents the filtration<br />

process. Also, the filtering process prevents the composition of groundwater with high<br />

density due to high salinity. The absence of organic contamination in the analysis of<br />

Книга 2. Часть 2. Проект ЗВОС по строительству ГХК<br />

96