“O’ZLITINEFTGAZ” PC<br />

PFS “<strong>Surgil</strong> field complex costruction with valuable<br />

components retrieval”<br />

temperature is 39°C. Gas moisture content gas is 5.36 g/m 3 , the initial potential content of<br />

condensate in the formation gas is 46.77g/m 3 .<br />

Carried out calculations of low-temperature gas separation process shows, that for the<br />

gas treatment of <strong>Surgil</strong> field in volume 3.0·10 9 m 3 per year with the regulated quality there is<br />

required construction of three identical technological lines of LTS by productivity of each<br />

3.0·10 6 m 3 /day.<br />

During supply of unstrapped gas from the field to one technological line of LTS in<br />

volume 125901 m3/hour, there will be extracting 123384 m3/hour of the stripped and dry<br />

gas and 4322 kg/hour of the stable condensate.<br />

For stable condensate storing it is necessary to provide condensate park on the CGTU<br />

proceeding from volumes of its extraction 311.2 t per day.<br />

It is also necessary to provide a reserve technological line.<br />

CGTU consist of the following constructions (figure 5):<br />

- incoming-line unit;<br />

- low-temperature gas separation plant (with turbo-expander);<br />

- DEG fire regeneration;<br />

- condensate separation and aeration plant;<br />

- assembly of self-supporting gas measuring (with reduction assembly);<br />

- technological pumphouse of condensate;<br />

- DEG warehouse;<br />

- torch separator platform;<br />

- drainage tank for DEG V=25m 3 ;<br />

- drainage tank for condensate V=63m 3 ;<br />

- area for torch farm;<br />

- condensate warehouse;<br />

- compressor house of compressed air;<br />

- condensate loading platform;<br />

- drainage tank of torch farm V=16m 3<br />

<strong>Volume</strong> 2. Part 1. EIS Project for <strong>Surgil</strong> field construction<br />

46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!