OAJ “O’ZLITINEFTGAZ”<br />

ПТЭО «Комплексное обустройство<br />

месторождения Сургиль с извлечением ценных<br />

компонентов»<br />

The direct impacts associated with the withdrawal of land for construction of<br />

accommodation facilities<br />

Seizure of land for surface facilities will be long term and short-term lease.<br />

In the long-term lease of land allocation under the site of MCC and a residential<br />

village, linen access road and railway. To accommodate external communications pipeline<br />

underground land diverted to short-term lease.<br />

Dimensions of land seized in the short-and long-term lease correspond to actual<br />

regulations. Area of land needed for the construction of designed structures will be adjusted<br />

to further stages of design.<br />

Mechanical effects associated with damage to soil and vegetation cover in the<br />

course of the excavation and construction works and redevelopment of vertical relief<br />

Vertical layout designed industrial sites and linen service roads made taking into<br />

account the existing topography, geological and hydrological features of the construction<br />

site.<br />

When laying off-site communications impacts on soil and vegetation would be shortlived<br />

- only during the construction period. In preparing the temporary removal of the band<br />

under laying of pipelines, there is an infringement of the surface layer of soil to a depth of 2<br />

m.<br />

After the construction and excavation, construction of the strip (the area a short term<br />

lease) is removed debris (remnants of pipes, insulation material, etc.) are exported all<br />

temporary devices, held technical and biological reclamation. Then these lands be returned<br />

to former owners in a condition suitable for economic use.<br />

One of the main measures aimed at protecting soil and vegetation cover, is a<br />

technical and biological reclamation of land disturbed in the process of construction works.<br />

Technical phase reclamation includes a range of activities for the removal and<br />

restoration of topsoil and preparing the territory of the construction of the (short-term land<br />

lease) for the biological stage of reclamation.<br />

Based on the soil conditions in the region of works, the removal shall be used in a<br />

fertile agricultural production capacity of soil 30.0 cm<br />

Bio-remediation is done after the technical phase and aims to restore the physical and<br />

biological properties of soil, improving structure and water and air regime of the arable<br />

horizon.<br />

Serious violations of land-cover can lead to haphazard journey of vehicles and<br />

construction equipment, and conducting planning works in a vertical layout for placing<br />

ploschadochnyh objects. On the territory of broken sand massifs possible significant<br />

activation of deflation.<br />

Analysis of violations occurring during construction at the facilities-analogues shows<br />

that the construction activities without protection activities (lack of access roads, work<br />

outside the ROW) violations in the area 3-5 times higher than the permissible area of<br />

drainage.<br />

Книга 2. Часть 2. Проект ЗВОС по строительству ГХК<br />

59