OAJ “O’ZLITINEFTGAZ”<br />

ПТЭО «Комплексное обустройство<br />

месторождения Сургиль с извлечением ценных<br />

компонентов»<br />

- Broadcast networks;<br />

- TV;<br />

- Chasofikatsiya.<br />

On-site residential village provides for the allocation of space for a communications<br />

center in the projected building the community center.<br />

Networking is automatically switched telephony is projected on the basis of<br />

electronic digital telephone exchange. As a subscriber devices used analog telephones.<br />

As a system of radio amplification system is used, which is installed in the<br />

communications center residential village. To broadcast voice and music programs provide<br />

a CD player and recorder dvuhkassetny.<br />

For meetings, meetings and celebrations at a community center (room conversations)<br />

is installed sound reinforcement system.<br />

Chasofikatsiya accomplished by the electronic clock.<br />

To receive broadcast television programs on top of buildings established by the<br />

collective antennae, which are mounted on steel towers.<br />

With the construction of buildings readiness survey is conducted and the result is<br />

determined by the soundings of the antenna and the type of central equipment.<br />

To connect user devices to the PBX residential village will be built on the site<br />

dvuhotverstnoy cable telephone conduit, with the installation of reinforced concrete wells,<br />

type of CCF. One channel provides cable telephony, and the other - for cables of radio.<br />

To connect telephone subscribers to residential village TSEATS chemical complex<br />

designed cable connecting line.<br />

For the organization of radio transmission network from the MCC to a residential<br />

village is laid cable length of 3 km.<br />

During the construction accounted for anti-seismic and anti-corrosion activities than<br />

that achieved by improving environmental safety.<br />

In the construction of auxiliary facilities management and infrastructure, as well as<br />

their operation would have been some increase in consumption of electricity, heat, fresh<br />

water, consumption of fuel gas, sewage, and that will cause a slight increase in induced<br />

pressure on the environment<br />

2.9 SOCIO-ECONOMIC ASPECTS<br />

In economics, natural gas is of paramount importance as a<br />

chemical feedstock and as one of the more efficient fuels, the most<br />

environmentally friendly, high quality and cost-effective compared with<br />

coal and oil.<br />

Книга 2. Часть 2. Проект ЗВОС по строительству ГХК<br />