“O’ZLITINEFTGAZ” PC<br />

PFS “<strong>Surgil</strong> field complex costruction with valuable<br />

components retrieval”<br />

2.7 GAS AND CONDENSATE TRANSPORT<br />

In the performance specification for development PFS “<strong>Surgil</strong> field complex<br />

construction with valuable components retrieval”, in Section II “Gas and chemical complex<br />

construction” there is provided GCC location by one of the variants, in the Akchalak<br />

settlement area of Kungrad region. This variant is optimum (figure 7).<br />

Treated and dry gas in volume 3.0·10 9 m 3 per year and a stable condensate in volume<br />

140·10 3 t per year from <strong>Surgil</strong> CGTU turned for processing to GCC, located in the area of<br />

Akchalak settlement.<br />

Preliminary hydraulic calculation of gas pipeline <strong>Surgil</strong> CGTU -Akchalak GCC is<br />

executed for productivity 9.09·10 6 m3/day. Gas pressure and temperature in the beginning<br />

of gas pipeline make 5.5MPa and 39 0 С relatively. Gas pipeline length is 115.0km.<br />

According to results of hydraulic calculation, if the diameter of gas pipeline is<br />

820х19mm, so gas pressure and temperature on input Akchalak GCC will make 4.7MPa<br />

and 25.9 0 С.<br />

Condensate line length is 115.0km. Condensate pressure and temperature in the<br />

beginning of condensate line make 1.6MPa and 25 0 С relatively. According to results of<br />

preliminary hydraulic calculation, if the diameter of condensate line is 219х11mm, so the<br />

condensate pressure and temperature on input Akchalak GCC will make 1.2MPa and 25 0 С.<br />

Gas pipeline<br />

Pressure – 5.4MPa<br />

Diameter - 820mm<br />

Length - 115km<br />

Condensate line<br />

Pressure – 4.5MPa<br />

Diameter - 219mm<br />

Length - 115km<br />

<strong>Surgil</strong> field is in the territory of Muynak area of the Republic of Karakalpakstan.<br />

The district of pipeline routes passage represents the fixed sands.<br />

<strong>Volume</strong> 2. Part 1. EIS Project for <strong>Surgil</strong> field construction<br />

51

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!