“O’ZLITINEFTGAZ” PC<br />

PFS “<strong>Surgil</strong> field complex costruction with valuable<br />

components retrieval”<br />

The site of 0.36 hectares, on which there is arranged dike by 0.8m height with two<br />

entrances from opposite sides is set aside for well. There are equipped working station,<br />

station for the unit-lift and platform under legs of the lift rig, and also 4 concrete anchors for<br />

rig guy on the wellhead. The well is equipped with a torch for a periodic well blowing-out.<br />

Thus, if necessary it is possible to make repair works on wells, works on increase of wells<br />

productivity.<br />

Technological decisions for natural gas gathering and field processing systems are<br />

the basis of the field construction project.<br />

Gathering of wells production of <strong>Surgil</strong> field in volume 3.0·10 9 m 3 per year is offered<br />

to carry out on three gathering stations (GGS) located in the field area. Then, gas from GGS<br />

and from 7 wells to GS, transfers through three collectors to <strong>Surgil</strong> CGTU for treatment<br />

(Figure 2).<br />

Preliminary hydraulic calculation of loops is executed on wells average rate of yield<br />

280.1·10 3 m3/days. Gas pressure and temperature in the beginning of wells loops make<br />

8.45MPa and 50°C relatively. Maximum length of loop of one well is 2km. Quantity of<br />

production wells - 54.<br />

According to results of hydraulic calculation pressure loss make 0.65MPa if the pipe<br />

diameter is 108х6mm and maximum length of loop is 2km.<br />

The control of wells operation is made by means of periodic measurement of the rate<br />

of yield of oil-gas condensate mix, amount of taken out liquid hydrocarbons (oil plus gas<br />

condensate) and formation water, with application of mobile measurement installation.<br />

There are equipped 54 wells for extraction of 3 billion cubic m per year (there is also<br />

considered the variant of 36 wells for 2 milliard extraction).<br />

Loops – 54 wells<br />

Pressure – 10.78MPa<br />

Diameter – 108mm.<br />

<strong>Volume</strong> 2. Part 1. EIS Project for <strong>Surgil</strong> field construction<br />