13.01.2015 Views

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

“O’ZLITINEFTGAZ” PC<br />

PFS “<strong>Surgil</strong> field complex costruction with valuable<br />

components retrieval”<br />

6 NATURE-CONSERVATIVE MEASURES<br />

Monitoring<br />

There is carried out industrial ecological monitoring for environmental safety in zone<br />

of possible impact of industrial projects.<br />

The industrial ecological monitoring defines ecological fixing of man’s impacts on<br />

environment, allows predicting not only direct, but also long-term cumulative effects of<br />

current loads.<br />

The industrial ecological monitoring is a part of structure of production environmental<br />

monitoring (PEM).<br />

There is allocated a number of specialized subsystems during division of PEM system<br />

on the basis of controlled component of environment. Recommendations about the<br />

organization of PEM subsystems in the region of designed constructions are given below.<br />

Offered industrial ecological monitoring includes:<br />

- control of atmospheric air condition;<br />

- control of sewage waters;<br />

- control of soil cover;<br />

- control of the waste treatment;<br />

The general requirements to PEM system are:<br />

- compliance of supervision methods with requirements of regulation and<br />

methodical documents;<br />

- choice of sites and monitoring points subject to conditions of environment<br />

and features of designed engineering object;<br />

- actual data acquisition on the condition of environment by performance of<br />

engineering-ecological supervisions with use of route researches, complex<br />

and local stationary supervisions;<br />

- received information processing by execution of cameral works, laboratory<br />

chemical-analytical researches with computer processing and modeling of<br />

the processes of interrelation of engineering constructions and natural<br />

environment components.<br />

Thus, the scheme of points placing of observational network is defined by location of<br />

considered new entered industrial projects and coordinated with local committee of<br />

environmental protection.<br />

Data acquisition is carried out by conducting:<br />

- regime observations;<br />

- laboratory analyses and experiments;<br />

<strong>Volume</strong> 2. Part 1. EIS Project for <strong>Surgil</strong> field construction<br />

95

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!