Surgil ESIA Report - Volume III - EKN
Surgil ESIA Report - Volume III - EKN
Surgil ESIA Report - Volume III - EKN
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
“O’ZLITINEFTGAZ” PC<br />
PFS “<strong>Surgil</strong> field complex costruction with valuable<br />
components retrieval”<br />
enterprise regulating conducting of industrial operations in the sphere of environmental<br />
protection, and also instructions and analytical techniques for the control of emissions,<br />
dumps, waste; examination of the construction documents on conformity to requirements of<br />
the legislation of the Republic of Uzbekistan in the sphere of environmental protection;<br />
organization of continuous ecological monitoring by forces of the specialized laboratories<br />
licensed and accredited according to requirements of the legislation of the Republic of<br />
Uzbekistan; training of the personnel to bases of ecological knowledge.<br />
Thus, activity in the sphere of environmental protection should put as the primary<br />
goals the actualization of the necessary permissible documentation in the sphere of<br />
environmental protection, organization and realization of continuous ecological monitoring<br />
of environment components condition in the area of realization of industrial activity, to<br />
consider the most strict requirements of the international organizations, such as the World<br />
Bank, International financial corporation, European community, and also EP laws of the<br />
Republic of Uzbekistan.<br />
2.2 PURPOSE, CHARACTER, CAPACITY AND STRUCTURE OF THE<br />
PRODUCTION<br />
The project purpose is the concretization of the basic technical decisions on<br />
construction of <strong>Surgil</strong> GCF, main transport of field production to objects of gas and<br />
chemical processing.<br />
The basis for working out are the decision of the President of the Republic of<br />
Uzbekistan №PP321 from April, 11. 2006 and the Memorandum of mutual understanding<br />
between “Uzbekneftegaz” NHC and Korean gas corporation from March, 29. 2006.<br />
There are revealed in the Republic of Uzbekistan considerable reserves of the<br />
hydrocarbons which development is interfaced to certain difficulties (remoteness and the<br />
inaccessibility, raised content of hydrogen sulfide, etc.), that dictates necessity of<br />
cooperation with foreign investors for mobilization of high technologies and additional<br />
financial assets.<br />
For the last years there is stored in the country the experience of construction of<br />
ecologically proved objects of oil and gas branch with participation of the foreign capital.<br />
There is created the favorable investment climate for mobilization of all forms of foreign<br />
investments.<br />
Analyzed project of complex construction of <strong>Surgil</strong> field with valuable components<br />
retrieval is the confirmation of aforesaid.<br />
Field capacity makes 3 billion m 3 /year.<br />
It is planned to equip 54 operational wells, 3 GGS, CGTU and also gas pipeline and<br />
condensate pipeline to constructions of gas and chemical complex with commercial account<br />
assembly. Personnel of <strong>Surgil</strong> CGTU will live in well-organized camp.<br />
<strong>Volume</strong> 2. Part 1. EIS Project for <strong>Surgil</strong> field construction<br />
34