13.01.2015 Views

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OAJ “O’ZLITINEFTGAZ”<br />

ПТЭО «Комплексное обустройство<br />

месторождения Сургиль с извлечением ценных<br />

компонентов»<br />

Sulfur Dioxide MPC 0,5 3<br />

Продолжение таблицы 9<br />

Name of substance The criteria used Criterion value,<br />

mg/m3<br />

Hazard<br />

Class<br />

Carbon monoxide MPC 5,0 4<br />

Fluorides gaseous MPC 0,02 2<br />

Fluorides badly soluble MPC 0,2 2<br />

Xylol MPC 0,2 3<br />

Benzo / a / pyrene MAC SS 0,000001 1<br />

Hydrocarbons (for gasoline) MPC 5,0 4<br />

Hydrocarbons (in kerosene) TSELs 1,2 -<br />

White Spirit TSELs 1,0 -<br />

Inorganic dust: MPC 0,3 3<br />

During the construction period projected objects in the air will go a few tens of tons<br />

of pollutants.<br />

Thus, during the construction of surface facilities will take place air pollution from<br />

road work and construction equipment (dust emission, the exhaust gases), which is<br />

insignificant in value and short on impact.<br />

During the construction period impacts on the aquatic environment will be provided<br />

through the removal of water resources. Water supply construction designed facilities will<br />

be carried out from the water Kungrad - COP Karakalpakstan, as well as, where appropriate,<br />

imported water in the tank.<br />

The volume of household wastewater generated during construction in an amount<br />

equal to water consumption. Discharge of such water is carried in a cesspool system. Reset<br />

is constant, but limited period of construction works.<br />

Works on construction of industrial sites and off-site communications related to the<br />

use of land as the construction period (short-term lease), and the period of operation of<br />

technological equipment (long-term lease).<br />

Sources of exposure are themselves under construction, as well as, construction<br />

equipment, machinery, motor vehicles.<br />

Necessary to allocate some of the impacts on land cover, both in the period of<br />

construction works, and during the operation of facilities:<br />

Книга 2. Часть 2. Проект ЗВОС по строительству ГХК<br />

58

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!