OAJ “O’ZLITINEFTGAZ”<br />

ПТЭО «Комплексное обустройство<br />

месторождения Сургиль с извлечением ценных<br />

компонентов»<br />

available water monitoring wells confirms the assumption that there is no<br />

contamination of groundwater.<br />

Based on the foregoing comprehensive assessment of environmental conditions<br />

in the area of the planned construction showed the following results.<br />

Impact on the atmosphere will increase slightly, especially for nitrogen oxides,<br />

however, in general, the functioning of the designed object will not change drastically<br />

existing level of air pollution.<br />

Impact on soil and vegetation will be expressed in violation of the integrity of the<br />

land cover in the implementation of civil works and laying of pipelines. Does not<br />

exclude the possibility of accidental spills of condensate with a burst pipe. After<br />

completion of construction works on laying the pipeline all the land reserved for<br />

temporary use, will be reclaimed. For reclamation in the budget incorporated the<br />

appropriate means. Spills, whose probability is extremely low due to the constructive<br />

execution pipeline does not pose a significant risk to the environment (soil, air).<br />

Accidents are subject to immediate elimination of the contaminated soil must be<br />

removed, the site of the accident being a complete restoration. Thus, we can say that<br />

the design solutions include respect for the soil and soils, while conserving the<br />

agricultural qualities.<br />

After the processes of vegetation restoration in a short time completely<br />

recovered. Accordingly, the animals after construction have the opportunity to return<br />

to their habitat. Barriers to migration routes of animals Planned construction is not<br />

installed.<br />

Landscape change (take industrial character), but not too much.<br />

Given the above, the impact on health service staff and people from MCC almost<br />

felt not to be.<br />

Thus, the overall forecast impact on the OPS is favorable, the planned construction<br />

will make its contribution to environmental (natural resources).<br />

Книга 2. Часть 2. Проект ЗВОС по строительству ГХК<br />

97

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!