“O’ZLITINEFTGAZ”<br />

open joint-stock company<br />

FS «Complex development of <strong>Surgil</strong> field<br />

with extracting of valuable components»<br />

• contaminated with oils;<br />

• sanitary;<br />

• mineralized.<br />

For the purpose of waste waters treatment it is necessary to arrange treatment facilities. In case it<br />

is necessary to treat waste waters locally it is performed.<br />

Also it became clear that it is necessary to arrange areas for temporary storage of solid wastes.<br />

Generally this waste includes used catalysts, molecular sieves, ceramic spheres, etc. There is the<br />

proposal being considered regarding construction of a landfill where waste will be stored and further<br />

managed or disposed.<br />

Ecological analysis for the technical decisions shows the following:<br />

• during construction of UGCC they will be applying up-to-the-minute gas treatment<br />

technologies, hi-tech equipment and materials of the complete delivery;<br />

• the ratio of the valuable components recovery from natural gas from <strong>Surgil</strong> field will be<br />

extremely high; those valuable components are ethane, propane, butane and light<br />

condensate; high-quality natural gas after drying procedure will be pumped into the gasmain<br />

pipeline;<br />

• the ratio of oils recovery from the oily wastewaters (with the help of separators of special<br />

construction) will be high;<br />

• UGCC will be equipped with the fuel system utilizing all combustible both gaseous and<br />

liquid wastes produced by the process units as the fuel in the cracking furnaces, steam<br />

generators, etc.; incoming gas supply will be minimum;<br />

• UGCC will have flare system similar to one in Shurtan GCC. The flare system will be<br />

continuously in ready mode and work during start-up while entering production mode or<br />

short-run when safety devices of the process equipment have actuated;<br />

• the problem of supply of PE product for the Republic of Uzbekistan and other countries<br />

based on advanced technologies carrying minimum environmental risks will be solved.<br />

3 WASTE WATERS SPECIFICATION AND DISPOSAL<br />

Water supply for UGCC will be carried out via 630x7mm water conduit of 75km length. For the<br />

purpose of uninterruptable water supply in situation with the single water line it is necessary to provide<br />

for the pondage during water conduit breakdowns elimination and an additional pondage for fire-fighting<br />

system.<br />

According to «SAMSUNG» company the amount of circulated water will total 38,375m 3 /h.<br />

During the normal operation of UGCC water consumption will total:<br />

• service/potable water requirements – 11m 3 /h;<br />

• process water requirements – 917.9m 3 /h including cooling water system – 772m 3 /h, HP,<br />

MP, LP steam system – 145.9m 3 /h<br />

• fire-fighting system (basins filling) – 360m 3 /h.<br />

Major water losses will be in steam generating and cooling systems.<br />

Book 5. Declaration of environmental impact concerning UGCC construction<br />

18