“O’ZLITINEFTGAZ” PC<br />

PFS “<strong>Surgil</strong> field complex costruction with valuable<br />

components retrieval”<br />

It is provided by the project following types of lightning: exterior lighting of<br />

territory, interior - working, emergency and repair lightning. Lamps voltage ~220V, repair<br />

~36V.<br />

Exterior lighting is provided to execute by lamps RKU-01-250 with mercury lamps<br />

DRL-250 installed on ferroconcrete support at height of 8m.<br />

Lighting of technological areas is executed by searchlights PZS-45 with glow lamps,<br />

installed on searchlight towers at height of 22m. Local lighting of technological areas is<br />

executed by explosion-proof lamps with glow lamps, installed on the fence railings and on<br />

the floorstanders.<br />

It is provided control box in the control post for remote control of exterior lighting.<br />

The control of lamps in premises is carried out by switches in a place.<br />

It is provided by the project following actions of electrical safety:<br />

- electrical equipment earthing at all steps of voltage according to PUE<br />

requirements;<br />

- lightning protection, earthing, explosive zones protection protection<br />

according to RD 34.21.122-87;<br />

- choice of electrical equipment and electric wirings according to the<br />

environment.<br />

This project of <strong>Surgil</strong> GCF construction for gas production of 3 billion cubic m per<br />

year provides electrochemical protection of the following constructions:<br />

- 54 wells, loops by diameter of 108х6mm, by length of 108km;<br />

- equipment of GGS -1. GGS -2. GGS -3 areas;<br />

- gas reservoir of GGS -1 - CGTU, GGS -2 - CGTU, GGS -3 - CGTU, by<br />

diameter of 273х9mm, by total length of 11.4km;<br />

- equipment of CGTUarea;<br />

- <strong>Surgil</strong> CGTU– Akchalak GCC gas pipeline by diameter of 820х9mm, by<br />

length of 115km;<br />

- <strong>Surgil</strong> CGTU– Akchalak GCC condensate line by diameter of 168х6mm, by<br />

length of 115km.<br />

The connection scheme of electrochemical protection provides joint and separate<br />

protection. Electrochemical protection is carried out by installation of the switchgears of<br />

cathodic protection UKZV, UKZN type and subsurface anode earthing devices from steel<br />

pipes by diameter of 219х8mm, by length of 75 and 100 meters.<br />

Power supply of buildings and constructions of the camp is provided from the enblock<br />

diesel generator on gas fuel.<br />

Design capacity makes 290kV.<br />

<strong>Volume</strong> 2. Part 1. EIS Project for <strong>Surgil</strong> field construction<br />

57

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!