2<br />

3<br />

4<br />

b. Unskilled category (Stress on literacy level, experience and<br />

safety consciousness).<br />

c. Trained & Experience Engineers/ qualified supervisor<br />

(BE/Diploma holder and / or selected by EIC,<br />

knowledge/relevant experience).<br />

d. Deployment/ development of highly skilled specialist<br />

technicians for critical jobs.(as and when required)<br />

Strictly following quality guidelines, quality plan(QAP) and /<br />

or checklist for each job, given by the Engineer In charge.<br />

a. Repetition of job due to bad workmanship including defect<br />

liability (frequency of occurrence & compliance for<br />

rectification).<br />

b. Improper use of <strong>DVC</strong> facilities (Example: Leaving<br />

junction boxes open after the job is over, keeping scrap,<br />

welding rod, cable & wire etc.)<br />

a. Maintaining cleanliness at workplace while working (use<br />

of working trays, container etc.)<br />

b. Proper handling of grease, oil etc. (proper container, no<br />

spillage & Contamination etc.)<br />

c. Cleaning the workplace including removal of scrap after<br />

completion of the job, removal of debris etc.<br />

05<br />

10<br />

0 to (-) 15<br />

06<br />

5 Use of proper tools & tackles applicable for a particular job. 05<br />

6<br />

B<br />

1<br />

2<br />

3<br />

Training of contractor’s manpower at <strong>DVC</strong> training centre for<br />

at least 02 hours per fortnight.<br />

Adherence to Time Schedule: Maximum 30 Marks<br />

Availability of all tools & tackles<br />

contractor) without any time delay<br />

(under the scope of<br />

Mobilization of proper skilled & unskilled manpower without<br />

any time delay<br />

a. Completion of job/supply of materials within the time<br />

frame specified in the contract (wherever<br />

available)/Project Milestone and Schedule.<br />

b. Advance Scheduling of Jobs along with Engineer In<br />

charge before start of the job.<br />

04<br />

05<br />

05<br />

10<br />

05<br />

W& P Manual – 2012 Page 124