b) No electrical repair work shall be carried out on any live equipment. It shall be<br />

done only by the Electrician having either ITI qualification or Wireman’s<br />

certificate issued by the State Government.<br />

In case any accident occurs during the construction or erection work or other<br />

associated activities undertaken by the Contractor In-charge, it shall be the<br />

responsibility of the Contractor to promptly inform the same to the Engineer Incharge,<br />

<strong>DVC</strong> Head of Safety Deptt. in the prescribed form (Which can be collected<br />

by the Contractor/ Agency from the Project Safety Deptt.), and also to all the<br />

statutory authorities envisaged under the applicable laws.<br />

The Engineer In-charge as well as <strong>DVC</strong> Head of Safety Deptt. or their nominated<br />

representative shall have the right at his sole discretion to stop the work, if in his<br />

opinion the work is being carried out in such a way that it may cause accidents and<br />

endanger the safety of the persons and / or property, and / or equipments. In such<br />

cases, the contractor shall be informed in writing, and the contractor shall<br />

immediately stop the work, and comply to remove shortcomings promptly.<br />

If the Contractor does not provide safety equipments to his workers or fails to<br />

discharge of his other responsibilities, statutory or otherwise, as mentioned above,<br />

<strong>DVC</strong> may provide the same and recover the expenditure along with overhead cost<br />

etc. However, this does not absolve the contractor from his responsibility as<br />

mentioned in the contract..<br />

If the Contractor fails complying with the provisions as mentioned above, the<br />

Contractor shall pay to <strong>DVC</strong> at the rate of Rs. 2,000/- per day or part thereof for<br />

contract value exceeding Rs Twenty Lakhs, and, at the rate of Rs 500/- per day for<br />

the contract value less than Rs 20 Lakhs till the instructions are complied with and<br />

so certified by the Engineer In-charge and <strong>DVC</strong> Head of Project Safety Deptt.. If<br />

it is not paid by the Contractor, it shall be deducted from his next bill.<br />

In case of injury, the compensation as calculated/ directed by the State Government<br />

Authorities shall be paid by the Contractor to the Victim/ his heir, in accordance<br />

with the statutory provisions.<br />

50. WORK PROGRAM<br />

50.1. CONTRACTOR’S ORGANIZATION<br />

The Contractor shall supply to the Employer and the Project Manager a chart showing the<br />

proposed organization to be established by the Contractor for carrying out work. The chart shall<br />

include the identities of the key personnel together with the curricula vitae of such key personnel<br />

to be employed within twenty-one (21) days of the Effective Date. The Contractor shall promptly<br />

inform the Employer and the Project Manager in writing of any revision or alteration of such an<br />

organization chart.<br />

50.2. PROGRAM OF PERFORMANCE<br />

W& P Manual – 2012 Page 174