Annual Maintenance Contract for any works/service contracts to OEM/OES may be for five<br />

year at a time wi t h PV i f an y s u bject to ap pro val o f c once rned Director<br />

a n d in c a se o f T A A i s B oard/ C hairman , a p p r o val o f c o ncer ned Me mb er<br />

s ha l l be o b ta i n e d.<br />

However in case of hiring of vehicle, period of contract with suitable PV clause may<br />

be considered for initially 3 years and followed by one / two year extension depending on the<br />

performance but total extension not more than 2 years.<br />

Site Maintenance contracts may be entered into rate contract after finalising the detailed Job<br />

specification/description. For working out the security deposit, where the contract is extended<br />

more than one year, if the contractor has submitted BG for Security Deposit cum performance<br />

guarantee, the same is required to get extended accordingly. Alternatively the contractor may<br />

submit a new BG and the earlier BG may be released.<br />

The contracts for transport would be a service contract and not to be termed as Works Contract.<br />

The Public Sector undertakings if awarded such contracts would be required to work<br />

as<br />

Contractors and if sub-contractors are engaged after obtaining of approval of TIA.<br />

The<br />

payments to contractors would be released after proper verification of documents, both by the<br />

indenting department and the Accounts.<br />

2. Identification of items to be covered under the Rate Contract.<br />

(a) Items whose requirements are continuous throughout the year and holding of high inventory<br />

level for a long period may not be feasible to optimize inventory cost, shall be covered under<br />

Rate Contract.<br />

(b) Items like Reinforcement Steel, Cement, Office stationeries, Chemicals, Lubricants, Petrol &<br />

Diesel, G.I. Pipes, Medicines, Transportation Welding Electrodes, Packing (both Metallic and<br />

Non-Metallic), Fastens, Hand Tools, Cutting Tools and Abrasives, Surface Coating Materials<br />

(Paints etc), Bearings &Accessories, V Belts, Lab. Chemicals, Office Furniture, Guest House<br />

Furniture, Switches, Plug Tops and Misc. similar materials, lamps, florescent Tubes, Fuses etc<br />

etc. may be brought under Rate Contract. This list is only exemplary and not exhaustive<br />

and<br />

many more items can be considered for rate contract like Conveyor Belts,<br />

Personal<br />

Computers, and structural Steel<br />

etc.<br />

(c) Indents complete in all respect of item for the requisitioning department shall reach<br />

the procurement section well in advance.<br />

(d) After receipt of indents, a tender committee comprising representatives of<br />

Purchase/Technical Section/TIA, Finance & User Department will decide and finalize the<br />

items for which Rate Contract to be made. The same is to be approved by CMM/Station<br />

Chief/CE. After deciding the items for which RC to be made, sources of procurement<br />

may be standardized using methodology described earlier.<br />

W& P Manual – 2012 Page 90