certificate from appropriate Govt. Authority giving details such as validity, stores, monetary limit<br />

etc. failing which exemption will not be granted.<br />

However, these SSI units will have to submit Performance Guarantee for the materials to be<br />

supplied as per <strong>DVC</strong> norms and to be submitted before the despatch of materials and no payment<br />

will be affected till the acceptance of the same.<br />

14. DEL<strong>IV</strong>ERY REQUIRED :-<br />

a) Materials to be delivered to consignee:<br />

i)Within<br />

*ii) within<br />

days of issuance of Purchase Order.<br />

days of date of drawing approval.<br />

Delete if it is not applicable for the tendered item. If the tendered item is to be supplied on the<br />

basis of approved drawing only, clause No. (a) to be linked with Serial (ii) only.<br />

The following needs to be inserted under this clause of NIT in filled up condition (to be furnished<br />

by Indenting Officer along with the indent) in order to firm up the delivery schedule and to<br />

identify the agency (<strong>DVC</strong>/Vendor) responsible for delay in delivery, if any, on execution of the<br />

contract.<br />

b) Drawing to be submitted to indenter for acceptance within days from date of<br />

issuance of Purchase Order.<br />

(‘Drawing’ means ‘Final Drawing’ which needs no further correction/alteration. Date of<br />

submission of final drawing to be reckoned as the date of submission of drawing by the vendor.)<br />

c) Approval of final drawing to be given by the indenting officer to the vendor within<br />

days from the date of submission of the same by the vendor.<br />

d) Inspection call (Fax/Post) to be given by the vendor to the consignee/indenting officer before<br />

15(fifteen) days of readiness of material for inspection/testing at their works.<br />

e) Inspector to be sent by the Consignee/Indenting Officer within 3(three) days of inspection date<br />

as mentioned in the inspection call letter or within 7(seven days of date of receipt of inspection<br />

call letter whichever is later.<br />

f) Dispatch clearance to the vendor to be given by the Indenting Officer through Fax/Post within<br />

5(five) days of date of inspection with a copy to consignee if not issued by the Inspection<br />

Engineer after inspection.<br />

g) Way Bill/Road Permit to be issued (by hand/post) by the consignee to the vendor (if not<br />

handed over by the Inspection Engineer along with the despatch clearance) within 3(three) days<br />

of issuance of despatch clearance/date of receipt of vendor’s request letter for the same.<br />

15. QUALIFYING REQUIREMENT : (Submitted the proof of the following documents<br />

before TC verification of the documents by L-1 bidder/s in support of the information furnished<br />

by them with techno-commercial bid failing which the offer of L1 will be rejected with forfeiture<br />

of EMD and banning bidder for one year from participating in future tenders.<br />