5. Tenders above the limit of 10% but upto 30% above of revised market cost under Sl.No.2 & 3<br />
above, rate should be approved by Member (Tech.) is required where TAA is CE and above. In<br />
other cases, approval of concerned Director is required.<br />
Tender committee must ensure before submission of its recommendation to the TAA that<br />
verification of documents/ credential of L-1 bidder is completed in all respect.<br />
All the members of TC should furnish the certificate in the tender evaluation report that none of<br />
them as any personal interest in any of the tenderers who have participated.<br />
A responding firm can quote on firm price basis or variable price basis (but not on both), as<br />
mentioned in NIT and each such offer will be considered accordingly. As far as possible, contract<br />
should be entered on “firm price basis”, while contract on variable prices can be considered on<br />
the merit of each case. As a general principle, no offer involving any uncertain or indefinite<br />
liability or any condition of unusual character should be considered.<br />
Whenever offer on variable price is asked, the standard price variation formula along with the<br />
base date should be clearly spelt out in the NIT documents by TIA.<br />
Negotiated prices also may be examined in a similar way. Justifications while making<br />
recommendation to accept higher prices shall be recorded.<br />
42. LACK OF COMPETITION:<br />
Lack of competition exists if the following factors intervene:<br />
a) The number of acceptable offers is less than three;<br />
b) Ring prices have been quoted by all the tenderers (cartel formation);<br />
c) The product of only one manufacturer has been offered by all the tenderers irrespective of the<br />
number of quotations;<br />
d) Store under purchase is chronically in short supply against which number of acceptable offers<br />
never exceeds two.<br />
In case it is observed that there is lack of competition for a particular tender enquiry, time<br />
extension may be given once with the approval of the TIA. If it is found after the extension, that<br />
there is no improvement of the response, normally the tender may be closed and action may be<br />
taken for re-tendering after due analysis by QR committee, for poor response, and if required may<br />
revisit the qualifying requirement. However TIA may permit opening of the bid in case or<br />
urgency and same to be recorded in file.<br />
43. PURCHASE PROPOSAL COVERAGE:<br />
With the above analysis and evaluation of offer received against the enquiry, the Tender<br />
Committee should give a comprehensive purchase proposal / work order proposal along with the<br />
checklist (placed in the Annexure) for acceptance of TAA. All proposals should begin with<br />
relevant facts and information, which is necessary for arriving at prudent decisions. Efforts should<br />
W& P Manual – 2012 Page 70