5. Tenders above the limit of 10% but upto 30% above of revised market cost under Sl.No.2 & 3<br />

above, rate should be approved by Member (Tech.) is required where TAA is CE and above. In<br />

other cases, approval of concerned Director is required.<br />

Tender committee must ensure before submission of its recommendation to the TAA that<br />

verification of documents/ credential of L-1 bidder is completed in all respect.<br />

All the members of TC should furnish the certificate in the tender evaluation report that none of<br />

them as any personal interest in any of the tenderers who have participated.<br />

A responding firm can quote on firm price basis or variable price basis (but not on both), as<br />

mentioned in NIT and each such offer will be considered accordingly. As far as possible, contract<br />

should be entered on “firm price basis”, while contract on variable prices can be considered on<br />

the merit of each case. As a general principle, no offer involving any uncertain or indefinite<br />

liability or any condition of unusual character should be considered.<br />

Whenever offer on variable price is asked, the standard price variation formula along with the<br />

base date should be clearly spelt out in the NIT documents by TIA.<br />

Negotiated prices also may be examined in a similar way. Justifications while making<br />

recommendation to accept higher prices shall be recorded.<br />

42. LACK OF COMPETITION:<br />

Lack of competition exists if the following factors intervene:<br />

a) The number of acceptable offers is less than three;<br />

b) Ring prices have been quoted by all the tenderers (cartel formation);<br />

c) The product of only one manufacturer has been offered by all the tenderers irrespective of the<br />

number of quotations;<br />

d) Store under purchase is chronically in short supply against which number of acceptable offers<br />

never exceeds two.<br />

In case it is observed that there is lack of competition for a particular tender enquiry, time<br />

extension may be given once with the approval of the TIA. If it is found after the extension, that<br />

there is no improvement of the response, normally the tender may be closed and action may be<br />

taken for re-tendering after due analysis by QR committee, for poor response, and if required may<br />

revisit the qualifying requirement. However TIA may permit opening of the bid in case or<br />

urgency and same to be recorded in file.<br />

43. PURCHASE PROPOSAL COVERAGE:<br />

With the above analysis and evaluation of offer received against the enquiry, the Tender<br />

Committee should give a comprehensive purchase proposal / work order proposal along with the<br />

checklist (placed in the Annexure) for acceptance of TAA. All proposals should begin with<br />

relevant facts and information, which is necessary for arriving at prudent decisions. Efforts should<br />

W& P Manual – 2012 Page 70