(VERSION-IV) - DVC :: Consumer Login
(VERSION-IV) - DVC :: Consumer Login
(VERSION-IV) - DVC :: Consumer Login
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
online and authenticity of the documents being produced by him/them, within the same time<br />
frame. No additional time will be allowed to the bidder for producing the required documents.<br />
b) In case the L1 bidder for any item fails to produce the documents within the specified<br />
period of 10 days in case of domestic tenders and 15 days in case of global tenders, or if<br />
any of the information furnished by L1 bidder on-line is found to be false by the<br />
Tender Committee during verification of documents, which changes the eligibility status<br />
of the bidder, then snap bidding/revise price bid/reverse auction at the discretion of TAA or<br />
Concerned Member ( in case of TAA is Board/chairman) will be resorted to within the<br />
remaining bidders instead of re-tender for the items/ contract in which the bidder was L-1<br />
with forfeiture of EMD with caution letter to refrain in future and in event of 2 nd instances<br />
EMD will be forfeited and banning of L1 bidder for one year from participating in<br />
future tenders considering time essence to finalise the tender.<br />
The Tender Committee will recommend for issue of Purchase Order to the successful<br />
bidder/s after evaluating their technical eligibility based on the computer generated evaluation<br />
sheets / manual comparative statement followed by verification of the documents<br />
submitted by L-1 bidder/s in support of the information furnished by them on line/off-line<br />
and after evaluation of the reasonableness of L-1 rates. The reasonableness of rates will<br />
be evaluated as per the provisions of Works & Purchase Manual of <strong>DVC</strong> and other<br />
guidelines issued from time to time. The approval for issue of Purchase Order to L-1 bidder/s<br />
will be accorded by the competent authority as per Delegation of Power based on the TC<br />
recommendation.<br />
After obtaining the approval of competent authority on tender committee recommendation, the<br />
Purchase order to the successful bidder/s will be issued and the scanned copy of the<br />
Purchase Order will be uploaded on the e-Procurement portal and/or the original copy will be<br />
sent to the bidder/s through registered/speed post<br />
The EMD of unsuccessful bidders will be refunded within 15 days after finalization of<br />
bid.<br />
The system will preserve the details of Techno Commercial bid and Price bid in the archives for<br />
auditing purposes and the same can be accessed with special authorization. In case of off-line,<br />
file will be kept with the dealing officer for any future reference.<br />
In exceptional circumstances if contract is to be finalised in deviation of the provisions, clauses,<br />
terms & conditions of the Works & Procurement Manual, then condonation of deviation<br />
are required to be approved by concerned Member if not specifically empowered otherwise.<br />
Further in case there is a deviation to CVC guidelines, the same is required to be approved by<br />
the Chairman under intimation to Board in due course and information to CVC & MOP.<br />
Power is delegated by the Corporation to condone / waive LD & SD Clauses to the Tender<br />
Accepting Authority as per Delegation of Financial Power and to the Chairman, in case Board<br />
is the Tender Accepting Authority, in respect of the following contracts to be awarded –<br />
i) Against Single Tender Enquiry on OEM / OES / PAC basis/Single source Standardisation.<br />
W& P Manual – 2012 Page 40