4<br />

a. Maintaining cleanliness at workplace while working (use of<br />

working trays, container etc.)<br />

b. Proper handling of grease, oil etc. (proper container, no<br />

spillage & Contamination etc.)<br />

c. Cleaning the workplace including removal of scrap after<br />

completion of the job, removal of debris etc.<br />

06<br />

5 Use of proper tools & tackles applicable for a particular job. 05<br />

6<br />

B<br />

1<br />

2<br />

3<br />

4<br />

C<br />

1<br />

2<br />

3<br />

4<br />

5<br />

Training of contractor’s manpower at <strong>DVC</strong> training centre for at<br />

least 02 hours per fortnight.<br />

Adherence to Time Schedule: Maximum 30 Marks<br />

Availability of all tools & tackles (under the scope of contractor)<br />

without any time delay.<br />

Mobilization of proper skilled & unskilled manpower without<br />

any time delay<br />

a. Completion of job within the time frame specified in the<br />

contract (wherever available)<br />

b. Advance Scheduling of Jobs along with Engineer In charge<br />

before start of the job.<br />

Mobilization time taken to start the job at the beginning of the<br />

contract after getting intimation from the Engineer In charge.<br />

Promptness to call.<br />

Adherence to Safety : Maximum 15 Marks<br />

100% Supply of PPE & Uniform as identified in contract for<br />

workers.<br />

Follow health and safety plan whatever layout by safety deptt<br />

time to time<br />

Special care while working at heights. (Use of proper sized<br />

platform / safety belts etc).<br />

Proper handling of material (while lifting heavy material at<br />

height). (Example: Use of cage / basket etc).<br />

Periodic testing of lifting tools & tackles which are at the<br />

contractor’s scope Inspection of Tools & Tackles before start of<br />

work and during the execution of contract whenever required.<br />

6 Participation in Safety Awareness of the workers and training 01<br />

W& P Manual – 2012 Page 128<br />

04<br />

05<br />

05<br />

10<br />

05<br />

05<br />

05<br />

02<br />

02<br />

02<br />

02