exceeding Rs.50000/- may be accepted in any of the above forms.<br />

The offer accompanied by B.G. against EMD will only be considered valid on acceptance of the<br />

Bank Guarantee. The offer not accompanied by EMD or specified EMD in proper form as<br />

defined above shall not be considered as valid tender for opening provided necessary stipulations<br />

are made in the NIT.<br />

i) Earnest Money will be refunded only to the unsuccessful Tenderer within 15 days after<br />

finalisation of Tender and no interest will be paid for the same.<br />

ii) The amount of Earnest Money will be refunded to the successful tenderer, after acceptance of<br />

their Security Deposit-cum-Performance B.G. / successful completion of the order.<br />

iii) Small Scale Industries registered with NSIC shall be exempted from the payment of Earnest<br />

Money. Small Scale Industries seeking such exemption must enclose valid registration certificate<br />

from the appropriate Govt. authority giving details such as validity, stores etc., failing which<br />

exemption will not be granted.<br />

7. CONDITIONS FOR FORFEITURE OF EMD :<br />

The EMD may be forfeited<br />

1. In case the purchase order/work order is not executed by the vendor in full.<br />

2. For failure of tenderers to accept the order / LOI / LOA placed within the validity period<br />

of their offer,<br />

3. Any bidder withdraws/varies his offer within the bid validity period before finalisation of<br />

the tender.<br />

4. If the bidder does not accept the arithmetical correction of its bid price.<br />

5. For failure to submit security cum performance BG within 30 days from the last day of the<br />

specified time limit as stipulated in the PO/LOI/LOA.<br />

6. If the acceptance of order is not received within the stipulated period.<br />

7. If the Bidder does not withdraw any deviation listed in Statement of Deviations at the cost<br />

of withdrawal indicated by him,<br />

8. If the Bidder refuse to withdraw, without any cost to the Owner, any deviation not listed<br />

in Statement of Deviations but found elsewhere in the Bid,<br />

9. On providing false or incorrect information in respect of qualifying requirement etc.<br />

10. In case the L1 bidder for any item fails to produce the documents within the specified<br />

period of 10 days in case of domestic tenders and 15 days in case of global tenders, or if<br />

any of the information furnished by L1 bidder on-line is found to be false by the Tender<br />

Committee during verification of documents.<br />