6 . In the process of standardization of sources, if required, committee may recommend for<br />

assessment of suppliers works for technical capabilities, process of quality assurance and<br />

availability of testing facilities, managerial competence, financial strength, turn over etc. In<br />

order to carry out this assessment committee may visit the suppliers works.<br />

7. As far as possible, committee shall look for multi- source standardization. However, in<br />

exceptional cases, s i n g l e s o u r c e s t a n d a r d i z a t i o n may a l s o b e<br />

r e c o m m e n d e d . After assessment of potential sources for standardization, committee shall<br />

prepare the final recommendations which shall be approved by Chief Engineer/ Head of unit.<br />

8. Standardization of sources shall be valid for a maximum period of THREE YEARS and be<br />

reviewed in such a manner that by the time its validity expires, new standardization, based<br />

upon the experience ranging three years period, is duly approved and in place, so as to<br />

ensure smooth procurement.<br />

9. Issue of tender enquiry to all the sources, in case of multi-source standardization, it shall be<br />

treated at par with open tender for the purpose of Delegation of Power.<br />

1 0 . A copy of approval of source standardization for various items must be sent to other<br />

power stations of <strong>DVC</strong> for their reference or similar action.<br />

11. Similarly, when details of standardization of items are received from other power station, those<br />

shall be brought to the notice of user department and may consider similar standardization at<br />

the station. This shall provide support to the efforts for source standardization for maximum<br />

items.<br />

12. Some items at power station which can be considered for source standardization : Welding<br />

Electrodes, Packing (both Metallic and Non-Metallic), Fastens, Hand Tools, Cutting Tools and<br />

Abrasives, Surface Coating Materials (Paints etc), Bearings &Accessories, V Belts, Lab.<br />

Chemicals, Stationery items, Office Furniture, Guest House Furniture, Switches, Plug Tops<br />

and Misc. similar materials, lamps, florescent Tubes, Fuses etc. This list is only<br />

exemplary and not exhaustive and many more items can be considered for source<br />

standardization (Source standardization for items like Conveyor Belts, Personal<br />

Computers, Reinforcement steel and structural Steel etc.<br />

1 6 . Integrity pact:<br />

In order to ensure transparency, equity and competitiveness in its procurement and works, <strong>DVC</strong> has<br />

decided to adopt Integrity Pact. The Integrity Pact (IP) envisages an agreement between the<br />

prospective vendors/bidders and the buyer committing the persons/officials of both the parties, not<br />

to exercise any corrupt influence on any aspect of the contract.<br />

The Integrity Pact shall be applicable for tenders having estimated value (excluding taxes and duties)<br />

of Rs.15 crores and above. Further, in case of tenders having estimated value (excluding taxes and<br />

duties) of Rs.50 crores and above, the Independent External Monitors (IEMs) shall be responsible to<br />

W& P Manual – 2012 Page 46