24.01.2015 Views

(VERSION-IV) - DVC :: Consumer Login

(VERSION-IV) - DVC :: Consumer Login

(VERSION-IV) - DVC :: Consumer Login

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

not be given effect to in evaluation and it will be assumed that the bidder complies to all the<br />

conditions of Bidding Documents. In case bidder refuses to withdraw, without any cost to the<br />

Owner, those deviations which the bidder did not state in the Deviation Schedules, the bid<br />

security of the bidder may be forfeited and the bid is liable for rejection.<br />

Bidders are requested to quote the technical parameters/ guaranteed technical particulars of the<br />

quoted item as per specification sheet/booklet enclosed with the bid document.<br />

(ii) Bidders are requested to offer their commercial terms and conditions as per Annexure-A<br />

attached herewith.<br />

(iii) Manufacturers are requested to offer their pricing as per Annexure - B attached herewith.<br />

15. PRICE BID EVALUATION PROCEDURE:<br />

Offered bids from any manufacturer will be evaluated in the following methodology. Bids from<br />

other than manufacturer to be evaluated by deleting the respective components which are not<br />

applicable to them, namely, ED, Cess, P&F charges etc.<br />

Original Basic Price : Ex-Works Price (Rs.) = Rs .….………..<br />

+Packing & forwarding charges, if any<br />

: ……% on basic price only<br />

+Excise Duty : ……% on ( Basic Price + P & F )<br />

+Education Cess<br />

: …… % on ED<br />

+Sales Tax/VAT : .......% on ( Basic Price + P & F + E.D.+ Cess )<br />

+Freight<br />

: …….% on ( Basic Price + P&F ) or any<br />

lump sum value<br />

(In case the bidder fails to quote any value, or quotes as per actual, the bid evaluation will<br />

be done on the basis of highest quoted freight charges by the other bidders.)<br />

+Insurance<br />

: ……..% on ( Basic Price + P & F + E.D. + Cess + S.T.)<br />

or any other value against documentary evidence<br />

or actual premium in case of <strong>DVC</strong>’s Open Policy<br />

(presently it is 0.0112% of basic price).<br />

+ Cost of withdrawal price : As declared by the bidder in annexure-D with the price bid.<br />

for declared deviation<br />

+ Highest quoted price of Other bidders, :<br />

in case the Bidder fails to quote the Mandatory items<br />

or description of item not as per our specification *<br />

+ Type test charge/3 rd Party Inspection Charge :<br />

W& P Manual – 2012 Page 155

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!