Completed Work means the executed/completed portion of Work Order/AMC/RC, Payment<br />

receipt documents with ref. to WO No. and date or execution certificate with executed value and<br />

referred order no. be also considered as a proof of execution even if the work has not been completed<br />

in totality (subject to furnishing proof of executed value of work in the form of certified copies of<br />

RA Bills) or any relevant documents, which is sufficient to proof the works completed or to be<br />

completed.<br />

“Similar work” should be clearly defined in the bid document having due regard to the work so as<br />

to generate adequate competition. Similar nature of work, sought for to qualify for a certain work,<br />

incorporated in the NIT shall be clear, unambiguous and specific and there shall not be any room<br />

for divergent interpretation at any stage.<br />

Any explanation /elaboration added to qualify similar nature of work shall not be supplant but<br />

supplement the same.<br />

To maintain equity, consistency and better transparency in the tendering process for the services/<br />

works / procurement which are common for individual projects, a QR committee at HQ level to<br />

be formed.<br />

However, QR as mentioned above is an illustrative one and may not be suitable for all<br />

AMC/Works/Services/ procurement. Tender accepting authority (TAA) is authorised to<br />

approve to meet his requirements for case-to-case basis so that adequate bidding response is<br />

achieved.<br />

QR should be carefully formulated so that capable contractors are not restricted from participation<br />

in the tender. However, a tolerance limit (say 5%) on the quantum of QR may be provided to take<br />

care of marginal shortfall and this shall be mentioned in NIT.<br />

11. FORMATION OF QR COMMITTEE:<br />

In order to finalise the QR of prospective bidders, a QR committee at appropriate level has to be<br />

formed at Projects/Stations/Field depending on the estimated cost (without taxes, duties and<br />

freight) as follows:<br />

W& P Manual – 2012 Page 30