ii) List of Certificates (mentioned in para 3.3 above) not required and the reasons of nonapplicability<br />

of the particular Certificate duly approved by Competent Authority (refer para 4<br />

b).<br />

iii)Any other related Document<br />

b) Competent Authority for Approval of Closing of Contract<br />

The Competent Authority for closing of Contract shall be Award Approving Authority not higher<br />

than Head of Project/Station.<br />

5 MONITORING OF CONTRACT CLOSING<br />

5.1To monitor and expedite Contract Closing activities and to facilitate timely intervention of<br />

higher management for expediting Contract closing activities, the following procedure shall<br />

be adopted.<br />

5.2 Standing Contract Closing Group (CCG) shall be constituted at the Project/Station for<br />

following up all the Contracts closing activities by the Project/Station. The CCG shall<br />

comprise of the following members:<br />

i) Representative of Site Erection/ Construction minimum SE<br />

level<br />

Member<br />

CONVENER<br />

ii) Representative of Site Finance minimum SE level Member<br />

iii) Representative of Site C&M minimum SE level Member<br />

iv) Representative of O&M minimum SE level (where applicable) Member<br />

(*The Nominations would be approved by Head, Project/Station)<br />

The CCG shall work under the overall guidance of Head Project/Stations. This Committee should<br />

also review the Contracts awarded by site Contracts / HQ but to be closed by Site .<br />

5.3 Monthly Review by Head Of Project/Station<br />

Head (Project/Station) shall review on monthly basis the Contract Closing of various Contracts by<br />

Project/Station (and other Contracts awarded by Corporate Contracts but to be closed by<br />

Project/Station). The review shall be organized by Convenor CCG.<br />

5.4 Quarterly Review by Member ( Tech )<br />

Member (Tech) shall review on Quarterly basis, the Contract Closing of various Contracts of<br />

Projects / Stations. This review shall be organized by Head (CMG).<br />

5.5 Monthly Exception Report by CMG<br />