1.0 PURPOSE<br />

PART-VI : CLOSING OF CONTRACTS<br />

The objective of this Procedure is to prescribe uniform guidelines for closing of Contracts.<br />

2.0 SCOPE<br />

This Procedure covers closing of Contracts awarded by Project / Station /HQ for (1) Site<br />

Packages for Project, as per approved Package List (2), Site Packages for R&M of the Station, as<br />

per approved Package List and (3) Other Capital Works of Station, (4) Transmission Line projects<br />

3.0 PROCESS<br />

3.1 TIME OF CLOSING<br />

3.1.1 The Contracts mentioned in para 2 above, placed by Project/Station/HQ shall require<br />

closing after obligations of both parties, viz. <strong>DVC</strong> and Contractor (as given hereunder for specific<br />

category of Contracts) are completed.<br />

a) In case of Supply-cum-Erection Contracts, the closing of the Contract shall be done after the<br />

Warranty period is successfully completed and the Contract Performance Guarantee (CPG) of the<br />

Contractor is returned / discharged.<br />

b) For Civil Packages, the closing of the Contract shall be done after completion of the Defect<br />

Liability Period and refund of Security Deposit to the Contractor.<br />

3.2 RESPONSIBILITY<br />

3.2.1 All Contracts pertaining to the Works for the Project/Power Station (Site Packages of the<br />

Project, Site Packages for R&M, Other Capital Works Contracts etc.) placed by Project/Power<br />

Station, shall be closed by Project/Station. All packages awarded by HQ should be closed by<br />

concerned Project.<br />

3.3 CERTIFICATES REQUIRED FOR CLOSING<br />

For Site Packages of Projects and R&M of Station<br />

The following thirteen (13) certificates, as per the proforma enclosed at Annexure-I (1 to 13),<br />

shall be issued by the concerned Departments and submitted to the concerned Authority<br />

designated in para 5.2.2 above, for closing of Contracts for Site Packages of Project/ R&M of<br />

Station / Capital Works of the Project / Station:<br />

Certificate No. Certificate Description Responsibility<br />

CC-01 Certificate of Final<br />

Amendment to the Contract<br />

CC-02<br />

Drawing Receipt Certificate<br />

(as applicable)<br />

Site (C&M)/ HQ<br />

Project<br />

(C&m/Project)<br />

W& P Manual – 2012 Page 266