17.11.2012 Views

Interim Report - Introduction - EASA

Interim Report - Introduction - EASA

Interim Report - Introduction - EASA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

INTERIM REPORT – OPTIONS FOR CHANGE<br />

<strong>EASA</strong>.2009.OP.21<br />

5 Information paper and briefing 6 December 2010<br />

Presentation of options to stakeholder representatives<br />

The purpose of the Stakeholder Representative’s Briefing (SRB) is for the Study Team to<br />

present and obtain feedback on the options available. By avoiding any recommendations it<br />

will be more likely that feedback from stakeholders is objective and informative – providing<br />

useful material for the pre-RIA. However, as can be seen in this document a lot of options<br />

have been developed. It is not the intention of the Study Team to present each and every<br />

option at the Briefing, nor in the associated Information Paper. Therefore some filtering will<br />

occur, and in this process, any excluded options may indicate a preference for those<br />

remaining. This is not necessarily the case. The Study Team will select the higher level<br />

options, and omit the specific.<br />

Clarification on these options to be included in the SRB will be made before the planned<br />

teleconference on 12 Nov 2010. <strong>EASA</strong> may then have the opportunity to make an input to<br />

the SRB Agenda.<br />

airsight GmbH 66

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!