17.11.2012 Views

Interim Report - Introduction - EASA

Interim Report - Introduction - EASA

Interim Report - Introduction - EASA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INTERIM REPORT – OPTIONS FOR CHANGE – ATTACHMENT B<br />

<strong>EASA</strong>.2009.OP.21<br />

regulation, it is an option to create an OPS requirement similar to this Rule.<br />

The impact would be that if the NAAs/<strong>EASA</strong> decided, based on current data (eg from SAE G-<br />

12) that a certain procedure, or fluid, was essential, or indeed hazardous, then they could<br />

immediately impose this on operators who would need to respond through their contracts<br />

with service providers.<br />

airsight GmbH - 86 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!