17.11.2012 Views

Interim Report - Introduction - EASA

Interim Report - Introduction - EASA

Interim Report - Introduction - EASA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INTERIM REPORT – OPTIONS FOR CHANGE – ATTACHMENT B<br />

<strong>EASA</strong>.2009.OP.21<br />

/ anti-icing vehicles as part of the aerodrome infrastructure, and service providers would<br />

share this fleet (see Article 8 below).<br />

An option would be to allow the aerodrome to include de-icing / anti-icing vehicles as part of<br />

the aerodrome infrastructure and effectively “rent” them to any service providers.<br />

The impact would be, perhaps, a larger investment in vehicles and some form of oversight of<br />

the quality and maintenance of these vehicles through the NAA oversight of the aerodrome.<br />

Clauses 22<br />

Whereas, in order to enable airports to fulfil their infrastructure management functions and to<br />

guarantee safety and security on the airport premises as well as to protect the environment<br />

and the social regulations in force, Member States must be able to make the supply of<br />

ground-handling services subject to approval;<br />

Clause 23<br />

Whereas, for the same reasons, Member States must retain the power to lay down and<br />

enforce the necessary rules for the proper functioning of the airport infrastructure; whereas<br />

those rules must relate to the intended objective and must not in practice reduce market<br />

access or the freedom to self-handle to a level below that provided for in this Directive;<br />

These two clauses indicate that, in the interests of safety, States must implement an<br />

approval system allowing approved organisations to supply their services; and to be able to<br />

achieve this States have the power to enforce any necessary rules.<br />

States may therefore decide to define technical rules for the proper functioning of de-icing /<br />

anti-icing; such technical rules could vary between simple minimum requirements concerning<br />

equipment standards, through availability of fluids, and up to full-blown regulation of<br />

procedures and training.<br />

The impact would vary depending on the level and quantity of technical rules defined.<br />

Article 4<br />

The managing body of an airport, the airport user or the supplier of ground-handling services<br />

must, under the supervision of the designated auditor, rigorously separate the accounts of<br />

their ground-handling activities from the accounts of their other activities.<br />

airsight GmbH - 75 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!