17.11.2012 Views

Interim Report - Introduction - EASA

Interim Report - Introduction - EASA

Interim Report - Introduction - EASA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INTERIM REPORT – OPTIONS FOR CHANGE<br />

<strong>EASA</strong>.2009.OP.21<br />

GHDSP2<br />

TRGSP<br />

REGAO<br />

REGAO1<br />

REGAO2<br />

REGAO2.a<br />

REGAO2.b<br />

REGAO2.c<br />

REGAO2.d<br />

Require States to approve organisations for the supply of deicing<br />

/ anti-icing services against a set of minimum<br />

administrative standards and technical specifications.<br />

As part of the State approval/selection of service providers<br />

through Directive 96/97/EC on ground-handling, require deicing<br />

/ anti-icing operatives to possess a valid vocational<br />

qualification in de-icing / anti-icing.<br />

To improve the existing regulations for operators; improve the<br />

interpretation of those regulations; and improve the oversight of<br />

operators in this regard.<br />

Require the approval of operators’ de-icing / anti-icing<br />

programmes against minimum requirements defined within the<br />

regulations.<br />

Develop an effective AMC in the form of an example of, or<br />

framework for, an operator’s de-icing / anti-icing programme.<br />

providing operators with a clear framework for an acceptable<br />

de-icing / anti-icing policy, procedures, training programme,<br />

providing operators with clear guidelines for establishing and<br />

maintaining<br />

procedures,<br />

effective communication and coordination<br />

providing operators with template communication messages<br />

and meanings connected with all inspections, checks and<br />

operations; in particular review of the anti-icing code, and<br />

clarification of the “all clear” signal/message (refer to COMM),<br />

providing operators with a structured framework for the relevant<br />

section of the OM (A8),<br />

REGAO2.e clarifying responsibilities for key decision-makers,<br />

airsight GmbH 71

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!