17.11.2012 Views

Interim Report - Introduction - EASA

Interim Report - Introduction - EASA

Interim Report - Introduction - EASA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INTERIM REPORT – OPTIONS FOR CHANGE – ATTACHMENT B<br />

<strong>EASA</strong>.2009.OP.21<br />

<strong>EASA</strong> NPA 2008 – 22c Under Review following CRD<br />

Implementing Rules for Air Operations of Community Operators -<br />

Draft Opinion and Decision Organisation Requirements (General)<br />

Applicability: One of six NPAs issued on “Authority and Organisation Requirements”<br />

containing draft Opinion on the Implementing Rules for Authorities, draft Opinion on the<br />

Implementing Rules for Organisations and the related draft Decisions. This NPA specifically<br />

contains requirements for establishing management systems and performance-based<br />

methods of operation.<br />

Options: For all elements of this NPA 2008 – 22, there may be time and motivation to<br />

include, in the first publication, amendments related to improving the standard of de-icing /<br />

anti-icing, through operators’ procedures and programmes, and also through the<br />

requirements for Authorities. Otherwise, amendments can be proposed after publication of<br />

the Implementing Rules for Operations and Authority Requirements.<br />

Impact: Any changes to these proposed regulations and associated supporting material will<br />

be immediately applicable on publication of the rules (pending any legal or practical periods<br />

allowed for adjustment).<br />

AMC 2 to OR.GEN.200(a)(2) Management System<br />

SAFETY MANAGEMENT SYSTEM – SAFETY RISK MANAGEMENT<br />

OTHER ORGANISATIONS<br />

1. Hazard identification processes.<br />

a. Proactive hazard identification processes should be the formal means of collecting,<br />

recording, analysing, acting on and generating feedback about hazards and the<br />

associated risks that affect the safety of the operational activities of the organisation.<br />

b. Hazards, events or safety concerns should be assessed, analysed, reported, the<br />

data collected and stored.<br />

c. Information provided by analysis should be distributed.<br />

d. Confidential reporting systems should be based on established human factors<br />

airsight GmbH - 36 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!