INTERIM REPORT – OPTIONS FOR CHANGE – ATTACHMENT B<br />

<strong>EASA</strong>.2009.OP.21<br />

operations approval.<br />

The NAA could verify compliance with recognised standards (AEA etc), and that the<br />

operator’s own procedures (as per the OM) and contracts with service providers were<br />

sufficient. It would also allow the NAA to verify the operator’s winter operations training<br />

programme was effective and ensure that the operator was actively collecting safety data<br />

from service providers.<br />

This would require NAA effort and investment; it would also raise the issue that where<br />

special operations approval was not granted that an operator would not be able to operate<br />

effectively in conditions of contamination.<br />