17.11.2012 Views

Interim Report - Introduction - EASA

Interim Report - Introduction - EASA

Interim Report - Introduction - EASA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

INTERIM REPORT – OPTIONS FOR CHANGE<br />

<strong>EASA</strong>.2009.OP.21<br />

c. The expected drying and re-hydration properties of thickened de-icing fluids be<br />

described and defined by standardisation in such detail as to eliminate significant<br />

quality variations among the products of different manufacturers.<br />

Current Status of these Recommendations<br />

Addressed so far:<br />

1a – <strong>EASA</strong> SIN 2008-29<br />

2a, 2b – <strong>EASA</strong> SIN 2008-29 and NPA 2009-09<br />

2c – <strong>EASA</strong> letter to aircraft manufacturers PBL/ein/C(1.1)2009(D)61465 dated 14<br />

April 2009<br />

For long-term consideration:<br />

4a, 4b, & 4c.<br />

For consideration within this Study (see below):<br />

1b, 1c, & 3a.<br />

airsight GmbH 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!