17.11.2012 Views

Interim Report - Introduction - EASA

Interim Report - Introduction - EASA

Interim Report - Introduction - EASA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INTERIM REPORT – DATA SUMMARY AND ANALYSIS<br />

<strong>EASA</strong>.2009.OP.21<br />

Therefore, the costs associated with upgrading vehicles/systems to provide two-step<br />

procedures can vary considerable between little to great and is dependent on their current<br />

equipment.<br />

2.2.3 De-icing / anti-icing fluids<br />

An analysis of the utilisation of non-thickened and thickened fluids is provided in Chapter 2.1.<br />

airsight GmbH - 26 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!