Interim Report - Introduction - EASA
Interim Report - Introduction - EASA
Interim Report - Introduction - EASA
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
INTERIM REPORT – OPTIONS FOR CHANGE<br />
<strong>EASA</strong>.2009.OP.21<br />
Table of Contents<br />
1 <strong>Introduction</strong>.....................................................................................................................1<br />
2 Data sources considered for this study.......................................................................3<br />
3 Summary of existing recommendations and options.................................................5<br />
3.1 Summary of relevant recommendations made by UK AAIB and German BFU<br />
(presented in A-NPA 2007-11) .............................................................................5<br />
3.2 Summary of options and impact assessments presented in A-NPA-2007-11 ..7<br />
3.3 Summary of results of CRD for A-NPA 2007-11...................................................9<br />
3.4 Summary of recommendations made from Study participants .......................11<br />
3.5 Summary of recommendations made by interviewees.....................................13<br />
3.6 Summary of relevant recommendations from AEA Training Manual ..............15<br />
3.7 Key themes from summaries...............................................................................17<br />
4 Options for change.......................................................................................................19<br />
4.1 The First and Most Important Recommendation ...............................................20<br />
4.2 Options to improve the collection and analysis of safety data........................21<br />
4.3 Options to improve communication and coordination – de-icing / anti-icing<br />
subject-matter experts .......................................................................................28<br />
4.4 Pathways to regulation ........................................................................................31<br />
4.5 Options concerning raising standards of de-icing / anti-icing.........................33<br />
4.6 Alternative models for regulating de-icing / anti-icing through operations<br />
regulations ..........................................................................................................44<br />
4.7 FAA SIAGDP .........................................................................................................53<br />
4.8 National authority requirements for oversight of operations...........................54<br />
4.9 Regulating de-icing / anti-icing through regulation of aerodromes ................57<br />
4.10 Availability of de-icing / anti-icing fluid types....................................................62<br />
4.11 Additional options ................................................................................................65<br />
5 Information paper and briefing 6 December 2010 Presentation of options to<br />
stakeholder representatives.......................................................................................66<br />
APPENDIX 1: List of Options .............................................................................................67<br />
airsight GmbH