17.11.2012 Views

Interim Report - Introduction - EASA

Interim Report - Introduction - EASA

Interim Report - Introduction - EASA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INTERIM REPORT – OPTIONS FOR CHANGE – ATTACHMENT B<br />

<strong>EASA</strong>.2009.OP.21<br />

programme.<br />

(c) The effectiveness of changes resulting from proposals for corrective action identified by<br />

the accident and flight safety programme shall be monitored by the quality manager.<br />

This Regulation is very much “interpreted” to be aimed at the operator, and personnel<br />

employed by the operator, and it is not clear that it extends to sub-contracted service<br />

providers and their personnel. Also this regulation has an emphasis on accident and incident<br />

reports, and not on safety data per se (of the type associated with Human Factors that might<br />

be appropriate to de-icing / anti-icing operatives). The supplementary information contained<br />

within JAA ACJ OPS 1.037(a)(2) does not expand on this emphasis and does not improve<br />

interpretation of the Regulation.<br />

Amending this Regulation to address the need for operators to collect safety data from<br />

subcontracted service providers and their personnel would make it clear that this is required<br />

(and beneficial). The inclusion of ICAO SMS Standards within Part Ops may achieve this<br />

task. Providing expanded and more explicit explanatory, and/or supplementary material may<br />

help operators interpret and follow the requirements.<br />

A broadening of operators’ safety focus, the integration of sub-contracted service providers,<br />

and the provision of more explanatory material within operators’ SMS’s will have a positive<br />

impact on safety.<br />

OPS 1.175 (i)<br />

General rules for air operator certification<br />

The operator must have nominated post holders, acceptable to the Authority, who are<br />

responsible for the management and supervision of the following areas:<br />

1. flight operations;<br />

2. the maintenance system;<br />

3. crew training; and<br />

4. ground operations.<br />

Appendix 2 to OPS 1.175<br />

airsight GmbH - 9 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!