12.07.2015 Views

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

d-<strong>lab.2</strong>, d-<strong>lab.2</strong>plus, net<strong>lab.2</strong>plus: OperationSettings and Configurations Repeat the calibration for the selected pumpto check if the calibration is correct:Hold the end of the hose in a graduatedbeaker.PressActivate DEV-W pump[Activate BX-W pump /Activate STB-W pump].Check the supplied amount of water onthe scale of the graduated beaker.Press the respective buttonReadjust DEV-W pump[Readjust BX-W pump /Readjust STB-W pump]and enter the measured supply rate.Empty the graduated beaker.Repeat the procedure if the calibration is notcorrect. If it is correct proceed as describedbelow. Remove the extension hose and connect thewater hose again. Proceed with the same routine for the othertwo pumps. Mount the tank covers again (1 screw each). Close the tank section cover:Support the cover with one hand.Press (PUSH) to unlock the cover.Close the cover.4AgfaPhoto 2005-05-01 / PN 04092_01 4-41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!