12.07.2015 Views

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

d-<strong>lab.2</strong>, d-<strong>lab.2</strong>plus, net<strong>lab.2</strong>plus: OperationMachine Shutdown11.3 Resuming OperationAfter the machine was shut down and out of operation for up to 2 weeks, the machinemust be put back in operation with the following routines: Remove the dust cover. If necessary fill water in the chemical tanksto compensate for evaporated water andwait for the machine to reach operatingtemperature. Turn the main breaker on. Mix replenisher chemicals. Check the chemicals, i.e. develop a chemicalcontrol strip (see Checking the ChemicalProcess in Chapter 5). Adjust the replenishment rates (see PaperProcessor Settings in Chapter 4). Proceed with the required maintenanceroutines (see Chapter 8 Maintenance).After the machine was shut down and out of operation for more than 2 weeks, themachine must be put back in operation with the following routines: Remove the dust cover. Proceed with the required maintenanceroutines (see Chapter 8 Maintenance). Mix the chemicals according to theinstructions in the Operation Manual. Put the machine back in operation accordingto the instructions in the Installation sectionof the Operation Manual.11AgfaPhoto 2005-05-01 / PN 04092_01 11-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!