12.07.2015 Views

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Testsd-<strong>lab.2</strong>, d-<strong>lab.2</strong>plus, net<strong>lab.2</strong>plus: OperationNoteDo not change the film carrier during a PIKO!The PIKO is interrupted when the film carrier is changed and the exposure window isnot defined correctly. This results in wrongly exposed prints (brightness, colors) andpossibly prints with white borders. Press in this order:TestStart PiCom3The pixel correction is started. Info screen inform about the calibration progress. Once thecalibration is completed the Start screen is displayed.NoteCheck the scan lamp if an automatic PIKO was triggered during production.Note: The terms PIKO, PICO, and PiCo are different abbreviations for pixel correction,but they all have the same meaning.5-22 2005-05-01 / PN 04092_01 AgfaPhoto

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!