12.07.2015 Views

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

d-<strong>lab.2</strong>, d-<strong>lab.2</strong>plus, net<strong>lab.2</strong>plus: OperationGeneral Description, Work Routines and OperationSwitch on the machine: Switch on the main breaker (1)2Switch off the machine: Shut down the machine as described in Endof Work and Shutdown in this chapter. Do not switch off the main breaker (1). The ground fault interrupter (2) remainsalways on.12G_GG220 (Fig. shows d-<strong>lab.2</strong>)AgfaPhoto 2005-05-01 / PN 04092_01 2-21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!