12.07.2015 Views

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

d-<strong>lab.2</strong>, d-<strong>lab.2</strong>plus, net<strong>lab.2</strong>plus: OperationGeneral Description, Work Routines and Operation2.4.3 Main Breaker and Ground Fault Interrupter212G_GG220 (Fig. shows d-<strong>lab.2</strong>)Main breaker (1) and ground fault interrupter (2) are located on the side of the Minilabnext to the sorter.Both switches remain always on for normal operation of the Minilab. The main breakermust only be switched off– for some maintenance work (see Maintenance, Chapter 8),– for various routines when changing the chemicals (see Changing Chemicals,Chapter 3),– for complete shutdown of the machine (see Machine Shutdown, Chapter 11).The ground fault interrupter (GFI) remains always on.AgfaPhoto 2005-05-01 / PN 04092_01 2-17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!