12.07.2015 Views

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Machine Shutdownd-<strong>lab.2</strong>, d-<strong>lab.2</strong>plus, net<strong>lab.2</strong>plus: Operation11.2 Machine Shutdown (Down Time longer than 2 Weeks)If the machine is shut down for more than 2 weeks the following measures must becarried out: Shut down the machine. Switch off the machine with the mainbreaker. Drain and dispose of the chemicals. Remove the Easy Paper Box and dispose ofit. Empty the effluent tanks and clean them. We recommend to fill the machine tankswith water and not to leave them dry. Toavoid the growth of algae add Algezit to thewater according to the description. After filling the machine with water run it fora few minutes. This avoids sticking of thetransport rollers. Shut down the machine again and switch offthe main breaker. Cover the machine with a dust protectioncover. Mark the machine as “out of order”.For measures and instructions regarding the disposal of chemicals and waste water see Chapter 10, Environmental Protection and Disposal.CAUTION!Observe the safety instructions for the handling of chemicals (see Chapter 1and Chapter 3).11-2 2005-05-01 / PN 04092_01 AgfaPhoto

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!