12.07.2015 Views

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Introductiond-<strong>lab.2</strong>, d-<strong>lab.2</strong>plus, net<strong>lab.2</strong>plus: Operation1.6.4 Service / Repair RoutinesWARNING!Observe the following points before starting service and repair work:– Replace fuses only by the same type of fuse (value, switch-off characteristics).– Please respect the country-specific safety precautions.– Be sure to switch off the machine before starting any service and repair work.− The machine is equipped with high-voltage carrying and fragile components. For thisreason, the following work must only be performed by authorized service technicians:− repairs on electrical components,− maintenance jobs / removal of parts and covers not described in the operationfolder.− Use original AgfaPhoto spare parts: only these parts have been tested for their safetyand usability.− When replacing electrical components: observe the data given in the circuit andwiring diagrams.− At the end of all service / maintenance work: check the general function of themachine as well as the correct condition of the safety devices.1.6.5 Disposal of the MachineThe machine must be disposed of as industrial waste.Consumables, chemicals, and spare parts must be disposed of in compliance with theapplying country-specific regulations.1-12 2005-05-01 / PN 04092_01 AgfaPhoto

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!