12.07.2015 Views

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

d-lab.2, d-lab.2plus, netlab.2plus - D-Lab 1

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

d-<strong>lab.2</strong>, d-<strong>lab.2</strong>plus, net<strong>lab.2</strong>plus: OperationMachine Shutdown11.1 Machine Shutdown (Down Time up to 2 Weeks)If the machine is taken out of operation for up to 2 weeks, it is not necessary to drain thechemicals. However, the following measures must be carried out: Shut down the machine. Switch off the machine with the mainbreaker. Empty the effluent tanks. Empty the replenisher tanks. Cover the machine with a dust protectioncover.Measures and information for the disposal of chemicals of replenisher tanks and/orsolutions of effluent tanks: see Chapter 10, Environmental Protection and Disposal.11AgfaPhoto 2005-05-01 / PN 04092_01 11-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!