13.07.2015 Views

ACS Assessor Guide - Security Industry Authority

ACS Assessor Guide - Security Industry Authority

ACS Assessor Guide - Security Industry Authority

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>ACS</strong> <strong>Assessor</strong> <strong>Guide</strong>Section 4 – Criterion Specific <strong>Guide</strong>lines: Criteria 2Criteria 2 – Processes2.2 An SIA Approved Contractor can demonstrate that it has a sound plan to ensure continuity of service delivery.2.2.1 There is a sound plan to ensure continuity of service delivery.Required Achievement LevelPlans for business continuityduring periods of labour shortagesexist.All aspects of the previouscolumn plus:The plans also cover incident andcrisis management in all aspects ofservice delivery.The plans are reviewed periodicallyto ensure continued effectiveness.All aspects of the previouscolumn plus:The plans also contain: details of actions to be taken named multiple responsiblepeopleThere is a schedule to review thecontinuing relevance andeffectiveness of the plans.All aspects of the previouscolumn plus:The plans for business continuityare tested regularly foreffectiveness.Actions resulting from tests of theplans for business continuity arecreated with resolution timeframes.The plans cover the full scope ofthe business.36The contents of this publication are copyright ©2013 <strong>Security</strong> <strong>Industry</strong> <strong>Authority</strong>, all rights reserved. No part of the contents may be reproduced or transmitted in any form, by any means without prior written permission of the copyright owner.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!